Upgrading to 2.07 (Read 2759 times)
Dave Nugent
YaBB Administrator
*****
Offline



Posts: 39
London
Gender: male
Upgrading to 2.07
Sep 15th, 2009 at 9:41pm
 
We have just gone from 2.04 to 2.07. We did some pretty thorough testing first by installing a test system with 2.04, including all the executables AND icom. Then we went through the upgrade and carried out a test plan over two weeks, comparing results with a parallel 2.04 system.

Results were good - a couple of minor issues and still the same problem with non accommodation PCM's. However, Geert managed to reproduce our PCM problems finally and got a sample off to NZ. They produced a patch - which fixed it *a bit*.  ie if we delete and re-insert all our service lines on our PCMs then finally they will book correctly through icom.
Back to top
 

The Administrator.
WWW  
IP Logged
 
Neil Fryatt
YaBB Newbies
*
Offline



Posts: 2
Re: Upgrading to 2.07
Reply #1 - Sep 17th, 2009 at 4:20pm
 
We had some issues with the db upgrade, luckily it was just our test database that didn't want any scripts applied. The only other issues of note were to do with the ini file, once that was sorted we were up and running.
Back to top
 
 
IP Logged
 
Page Index Toggle Pages: 1
Send Topic Print